Stock Outs

Situation — Aerospace components firm was having “stock-outs” of critical items at bottleneck operations.

​

Task — Develop a means of ensuring component availability

​

Action — Worked with the VP of Operations to create a “Supermarket” of critical items at key operations. Developed and implemented a "Tandem" MRP/Min-Max approach. MRP planned components into central stores and used “Kanbans” to pull items in to the work center supermarket when on-hand levels dropped below a pre-set minimum quantity.

​

Result — fewer stock-outs with minimum increase in inventory.

Bottleneck

Situation — Bottleneck at receiving inspection. 

​

Task — Develop a process to reduce inspection time without increasing headcount. 

​

Action — Established a Supplier Certification Program. Required suppliers to document inspection results for supplied components. Set up ASQ Skip Processes to reduce the frequency of inspection for dependable suppliers/items.

​

Result — Reduced average inspection time from 1 week to 2 days.

​

​

​

​

​

Case Study: Aerospace Components Manufacturer (Enidine)

Screen Shot 2021-12-14 at 8.56.04 AM.png

Contractor Management

Situation — Rural Electric Coop needed a better means of tracking subcontractors at multiple sites in Rural Alaska.

​

Task — Implement a Purchasing Contracts system to build contracts, produce electronic/paper documents, and track submission of project documentation and milestone reports.

​

Action — Configured an off-the-shelf Purchasing module and loaded Client Contract Documents, developed training for Purchasing staff.

​

Result — Purchasing was able to manage sub-contractors and ensure projects were completed according to contract awards/documentation and project schedule

"Gary was able to set up, implement, and train our Purchasing Department on the Purchase Contracts system in just 6 weeks."

​

Purchasing Manager, Golden Valley Electric – Fairbanks, Alaska

User Training

Situation — Managed a Project to provide training to 200 client users. The project included 38 different classes over a 3-week period. Workers go on strike the day classes are to start.

​

Task — Reschedule 38 classes with limited space available.

​

Action — Delivered some training on the shop floor due to lack of classroom space. 

​

Result — Completed training on time, got great user buy-in from shop floor students.

​

"Gary and his team were able to provide this training under extreme constraints - time and space. They delivered completely and on time." Garlock ERP Project Manager

​

Garlock Sealing Technologies, Palmyra, NY

​

User Training

Situation — Clients, team members at remote locations. Not able to bring participants to a single location.

​

Task — Conduct training or conduct meetings without travel, time away from plant/office.

​

Action — Used Webex, Go To Meeting, SKYPE (now Zoom and MS Teams) to collaborate via the internet.

​

Result — Saved clients days of un-productive time traveling and expenses attending meetings.

​

​

​

​

​

Case Study: Wyman/Gordan, Camping World

​

Stalled ERP Project

Situation — Electronics manufacturing client lost focus on the implementation of an ERP system and the project stalled. The implementation team needed revamping.

​

Task — Review project assumptions and plans and make recommendations to restart the project.

​

Action — Interviewed stakeholders, reviewed software modules, redesigned project plans, and made recommendations to management. I was selected to lead the new project implementation.

​

Result — Successfully implemented the ERP system in 90 days. 

Screen Shot 2021-12-14 at 8.57.34 AM.png

"Gary reviewed our stalled Oracle ERP project. He made several suggestions to get us back on track including using a building block approach. After approving his project plan Gary and his team implemented the system in 90 days."

​

Rick Cirincione, President, Electronics Component Manufacturer.